LV CT metering advice form

For use by contractors and switchboard manufacturers to advise of LV CT revenue metering installations.

Important information:

  • Switchboard Layout and Single Line Diagram must be supplied
  • For switchboards containing multiple CT meters, it is essential to provide the details (CX or EWR, NMI, and Max Load) for each of the connections that require assessment via this webform
  • Please identify the NMI that will be associated with each CT chamber
  • When opting for the expedited* service, you will be charged a single fee per submission
  • If you require expedited* assessments for additional connections within the same switchboard at a later date, another expedited fee will apply for each subsequent service request
  • An accepted offer must be in place for all connections that require assessment in this submission.

* Expedited applications are currently not available.

Please view our privacy statement regarding the collection of data.

Required fields are marked with an asterisk (*).

Contractor Contact Details
Please enter the ABN as 11 digits with no spaces
Please enter your best business hours contact number as 10 digits with no spaces
Connection Details
Please advise how you would like your application to be managed IMPORTANT: Expedited applications are currently not available.
Which Queensland Electricity Connection Manual (QECM) are you applying under?
Please enter first name and last name
Street address of the connection
CTs are required for
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Please enter a 15 digit EWR or CX reference number
Is there a combination of CT and whole current metering in this switchboard?
Confirmation & Attachments
Meter panel location
Maximum file size 5MB
Maximum file size 5MB
Maximum file size 5MB
Maximum file size 5MB
Important note for attachments
Acknowledgements